← NRC enforcement actions

NRC CAL – NOV (White)

EA-08-028 · CAL · Issued 2008-02-29 · Reactor Licensees

Action

EA Number
EA-08-028
Licensee
NOV (White)
Category
Reactor Licensees
Action type
CAL
Date issued
2008-02-29

Description

On February 29, 2008, a Notice of Violation was issued for a violation associated with a White Significance Determination Finding involving a violation of the Unit 1 Technical Specification (TS) 3.8.1, "AC Sources - Operating," which requires that while the plant is in Modes 1, 2, 3, or 4, two diesel generators (DGs) capable of supplying the onsite Class 1E power distribution subsystem(s) shall be operable. From November 1, 2007, through November 21, 2007, while the plant was in Mode 1, one of the two DGs capable of supplying the onsite Class 1E power distribution subsystem(s) was inoperable, and action was not taken to either restore the DG to an operable status within 72 hours or be in Mode 3 within 6 hours and Mode 5 within 36 hours. Specifically, Emergency Diesel Generator (EDG) 1-02 was made inoperable as a result of painting activities due to paint having been deposited and remaining on at least one fuel rack in a location that prevented motion required to support the operation of the EDG. This condition caused EDG 1-02 to fail to start during a surveillance test on November 21, 2007.

Source

Full letter
PDF on NRC ADAMS
NRC index
Reactor Licensees enforcement actions
Machine
JSON-LD · Markdown